Retrofit, Renewal and Modernisation

Not every mechanical system needs full replacement. With the right engineering analysis, existing infrastructure can be retained, equipment that has reached the end of its economic life can be renewed, and system performance can be improved substantially.

AnkaraSiemens Approved Partner
In short

Mechanical retrofit means renewing equipment that has reached the end of its economic life or no longer performs, without replacing the entire infrastructure of a live facility. Pipe, boiler, pump, valve and manifold retrofits can be carried out individually or in phases. Haustech Mekanik puts operational continuity first: the shutdown plan and rollback scenario are agreed in writing before work starts.

Measure first, decide second

The most expensive mistake in retrofit work is carrying out a replacement that was not needed. Changing equipment before finding the real problem usually just transfers the problem to the new equipment. That is why every retrofit begins with measurement and analysis.

Operational continuity

For a hotel, hospital or production facility, stopping is more expensive than the retrofit itself. Temporary lines, by-pass solutions and weekend or out-of-hours working minimise the outage.

Our retrofit services

  • Pipe replacement — renewing corroded, leak-prone or undersized lines
  • Boiler replacement — replacing end-of-life boilers with new generation systems
  • Pump replacement — renewing pump systems with equipment matched to duty and conditions
  • Valve and fitting overhaul — renewing control, balancing, isolation and safety devices
  • Manifold retrofit — restructuring distribution to match capacity and control needs
  • System conversion — modernising legacy mechanical systems to current technology

Frequently asked

Retrofit or full replacement — which is right?

The decision depends on the condition of the existing infrastructure, remaining life, any change in capacity requirement and tolerance for downtime. After the survey we present both scenarios comparatively so the decision is made on data.

How many days will my facility be down during a retrofit?

Our aim is zero or the shortest possible outage. Depending on scope a temporary solution can be installed; where an outage is required its duration is committed at proposal stage and written into the programme.