Boiler Room and Thermal Plant Installations

The boiler room is the heart of a building's mechanical system. Every mistake made here grows along the distribution network — and every correct solution is felt throughout the building.

AnkaraSiemens Approved Partner
In short

A boiler room or thermal plant installation means designing and building the heat generation equipment, safety and expansion group, low-loss header, manifolds, pump sets and measurement and control hardware as one package. Haustech Mekanik carries out both new boiler room construction and the renewal of existing thermal plants under a phased programme that can be planned without stopping operations.

Layout and accessibility

A good boiler room is built with the technician who will service it ten years later in mind. When service clearances, valve access, measurement points and labelling are done correctly on day one, operating cost falls for the life of the system.

Safety and compliance

Safety valve sizing, expansion vessel volume, closed-circuit pressure control and ventilation openings are not negotiable items. When a boiler room is handed over, the calculations and records for these are delivered with it.

Phased renewal

Renewing a boiler room in an occupied building does not have to happen in one go. Boiler, pump set, manifold and control layer can be split into separate phases; each phase delivers benefit on its own and the budget is spread over time.

Our boiler room and thermal plant scope

  • New boiler room construction
  • Cascade boiler systems
  • Boiler replacement and conversion
  • Plate and shell-and-tube heat exchangers
  • Low-loss header and buffer vessel
  • Safety and expansion group
  • Manifold fabrication and installation
  • Pump sets and speed control
  • Metering, labelling and documentation

Frequently asked

How long does a boiler room renewal take?

It depends on scope and existing condition. Boiler and pump replacement alone can often be completed within a few days; a complete renewal including manifolds and the control layer takes longer but can be phased. We issue a day-by-day programme after the survey.

Can a boiler be replaced during the heating season?

Yes, but it requires planning. Temporary heating, staged replacement in cascade systems or short outage windows make in-season work possible. Risks and outage duration are shared in writing at proposal stage.